EV charging & solar

Charging infrastructure and solar power, delivered as one build.

We provide a complete, end-to-end solution for EV charging stations and solar installations — from the first design drawing to the day you switch it on. One team carries the project through design, calculation, construction, installation, testing and handover.

The build, stage by stage

Six stages. No gaps between them.

Because the same team owns every stage, decisions made at design carry through to what actually gets installed on site.

01

Design

We study the site, the expected load, and how the installation will be used — a fleet depot, a commercial car park, or a rooftop solar array — and produce a system layout suited to it.

02

Calculation

Load calculations, cable sizing, panel capacity and expected generation are worked out before anything is ordered, so the system is sized correctly the first time.

03

Construction

Civil and electrical works — trenching, foundations, cabling and mounting structures — are carried out on site, matched to the approved design.

04

Installation

Chargers, inverters, panels, switchgear and metering are installed and wired according to spec, ready for testing.

05

Testing

Every circuit and connection is tested for safety and performance — insulation resistance, earthing, load response — before the system is signed off.

06

Handover

You receive complete documentation, warranties and operator training, so your team knows exactly how to run and maintain the system.

Two systems, one build

Solar and EV charging, designed to work together.

Where it makes sense, we pair on-site solar generation with EV charging so power is generated close to where it's used — reducing draw from the grid and future-proofing the site.

Rooftop & ground-mount solar

Sized to the site's roof or land area and matched to expected consumption.

AC & DC charging points

Specified for the vehicle types and turnaround time your site needs.

Metering & monitoring

Visibility into generation and consumption from day one of operation.

Have a site in mind for EV charging or solar?